Profile
Electric Charging Station Rancho Cucamonga CA US
The Electric Charging Station at the City of Rancho Cucamonga – Fire Training Academy, located at 11297 Jersey Blvd, offers convenient EV charging options for residents and visitors in Rancho Cucamonga, CA. This facility supports a range of electric vehicles, providing multiple Level 2 and Level 3 chargers to accommodate diverse needs. Users can access fast-charging capabilities through Level 3 stations, ideal for quick top-ups, while Level 2 chargers offer reliable, slower charging for extended stays.
The station features a variety of connector types, including CCS (Combined Charging System), Tesla, and NEMA, ensuring compatibility with most electric vehicles on the market. Availability of chargers is regularly updated, allowing users to plan their visits efficiently. The location is designed for accessibility, with ample parking spaces and clear signage to facilitate easy navigation. This charging station underscores the City of Rancho Cucamonga’s commitment to supporting sustainable transportation infrastructure.
Location Reviews
No reviews are available for the Electric Charging Station in Rancho Cucamonga. The provided information outlines the installation of four 200kW DC Fast Charger (DCFC) stations at the RC Sports Center parking lot as part of the city’s EV Charging Station Hub. These chargers, priced at $0.35 per kW, are described as the fastest in the city and aligned with sustainability goals, complementing broader plans like the Epicenter Master Plan. Officials, including Fred Lyn, have emphasized the initiative’s role in promoting clean energy and supporting EV adoption.
The city of Rancho Cucamonga currently has 87 public charging stations, including 10 free stations and 7 DC Fast Chargers. Data highlights the presence of multiple charging networks (e.g., ChargePoint, Supercharger) and infrastructure details such as plug types (CCS, CHAdeMO, J-1772). However, no user feedback or direct evaluations of the charging stations’ performance, accessibility, or reliability are included in the provided content. The overall sentiment from official statements is positive, focusing on sustainability and infrastructure expansion, but user experiences or criticisms are not documented.
Sources
Map
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.