Profile
Electric Charging Station Palo Alto CA US
Electric Charging Station at 3176 Porter Dr, Palo Alto, CA, is a convenient EV charging facility operated by Lockheed Martin’s Solar and Astrophysics Laboratory. This station provides essential charging services for electric vehicles, supporting sustainable transportation in the region. Notably, the site leverages advanced energy solutions aligned with Lockheed Martin’s expertise in solar technology and scientific innovation, reflecting a commitment to environmentally responsible infrastructure.
Located on the grounds of the Solar and Astrophysics Laboratory, the charging station offers a reliable option for drivers seeking to recharge their vehicles while benefiting from the lab’s cutting-edge research and development in renewable energy. While specific amenities such as fast-charging capabilities or on-site facilities are not detailed in available information, the location underscores a synergy between technological advancement and sustainable practices. For additional details, including directions or reviews, visitors are encouraged to consult mapping services or business directories.
Location Reviews
The provided content does not include user reviews or direct feedback about electric charging stations in Palo Alto, California. Instead, it offers statistical and logistical information about the city’s charging infrastructure. Palo Alto has 382 public charging stations, including 17 free stations and 19 DC Fast Chargers. The city’s charging network includes a mix of Level 2 and DC Fast chargers, with 319 J-1772 plugs, 18 CCS plugs, and 8 CHAdeMO plugs. Major networks operating in the area include ChargePoint (171 stations), Wevo Energy (66 stations), and Supercharger (39 stations). The data highlights the city’s extensive charging coverage, with popular locations such as Stanford Shopping Center and Palo Alto City Hall frequently noted for their accessibility.
No specific user experiences, complaints, or praises are mentioned in the provided material. The information focuses on infrastructure metrics, such as the number of new stations added in the past 90 days (50) and the absence of Superchargers. While the data underscores Palo Alto’s investment in EV infrastructure, it does not address user satisfaction, reliability, or any challenges (e.g., availability during peak hours or maintenance issues). Overall, the sentiment remains neutral, as the content is purely descriptive and lacks qualitative feedback from users.
Sources
Map
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.