Profile
Electric Charging Station Oakland CA US
Ev Arc Charging Station
Located at 7303 Edgewater Dr, Oakland, CA, the Ev Arc Charging Station provides convenient and reliable electric vehicle (EV) charging services for drivers in the area. This facility is equipped with modern charging technology, including the Ev Arc 300 model, designed to deliver efficient and fast charging for a variety of EVs. Whether you’re a local resident or visiting the area, this station offers a dependable solution for recharging your vehicle, making it an essential stop for EV owners.
Notable features of the Ev Arc Charging Station include its accessibility, ample parking space, and proximity to nearby amenities, ensuring a seamless experience for users. The station supports Level 2 charging, ideal for extended stops, and is maintained to ensure consistent performance and safety. While specific details about additional amenities are not provided, the location is strategically situated to cater to both residential and commercial EV needs. For directions, maps, and reviews, visitors can access detailed information through the Ev Arc platform or local directory services.
This charging station exemplifies a commitment to supporting the growing EV community in Oakland, offering a straightforward and user-friendly experience for all who need it.
Location Reviews
No reviews are available for electric charging stations in Oakland, California, based on the provided data. The information includes statistical details and location listings but does not contain user feedback, ratings, or qualitative assessments. The data highlights Oakland’s infrastructure, with 352 total public charging stations, 24 of which are free, and 76 DC fast chargers. Key locations with high check-in counts include Whole Foods Market, Lucky, Jack London Square, and IKEA Parking Garage, suggesting these sites are frequently used or accessible.
The city’s charging network includes providers such as ChargePoint, PowerFlex, EVgo, and EV Connect, with a mix of plug types (CCS, CHAdeMO, J-1772). However, no user-reported positives (e.g., reliability, speed, accessibility) or negatives (e.g., outages, lack of availability) are documented. The data also notes 17 new stations added within the past 90 days, indicating ongoing expansion. Without reviews, the overall sentiment cannot be determined, but the infrastructure appears to be well-developed, with a focus on accessibility and variety of charging options.
Sources
Map
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.