Profile
Electric Charging Station Clovis CA US
Located at 580 Shaw Ave, Clovis, CA, this Electric Charging Station provides convenient access to electric vehicle (EV) charging services for drivers in the area. The station supports a range of EV models and is designed to accommodate both residential and commercial users seeking reliable charging solutions. It is strategically positioned to serve local commuters, travelers, and businesses looking to reduce their carbon footprint while ensuring their vehicles remain powered.
While specific details about the number of charging ports or amenities are not provided, the station is accessible via standard mapping tools and directions, allowing users to plan their visits effectively. Potential users are encouraged to check reviews and additional information online for real-time updates on availability, charging speeds, and any on-site features. This location underscores Clovis, CA’s commitment to supporting sustainable transportation infrastructure.
Location Reviews
The Electric Charging Station at 695 Herndon Ave, Clovis, CA, has a 3.8-star rating based on 19 Google reviews, with mixed feedback from users. Common criticisms include slow charging speeds compared to Tesla Superchargers, with one reviewer noting a potential wait time of over an hour, and reports of malfunctioning equipment, such as a broken charger. Several users also expressed concerns about the accuracy of the station’s address in the app, with one reviewer explicitly advising others to rely on Google’s listed location instead of the app’s information. Additionally, there were mentions of at least one machine being offline during visits, raising reliability concerns.
Despite these issues, no specific positives were highlighted in the provided reviews, though the station’s operational hours (Monday–Friday, 9:00 a.m.–6:00 p.m.) and location in a city with a growing number of EV charging stations (134 total in Clovis) suggest it may serve a practical need for local users. The overall sentiment leans slightly negative due to recurring complaints about performance and reliability, but the station remains part of Clovis’s broader network of 22 DC Fast Chargers. No reviews explicitly praised the service, availability, or speed, leaving the assessment primarily focused on the aforementioned drawbacks.
Sources
Map
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.